7CE9   ENVIRONMENTAL ENGINEERING LAB. & DESIGN – II            P 2

1.  To determine the pH of the given sample of sewage.

2.  To determine Total Solids of the given sewage sample.

3.  To determine the Total Dissolved Solids of the given sewage sample.

4.  To find out Total Settle-able Solids of the given sewage sample.

5.  To determine Total Suspended Solids of the given sewage sample.

6.  To find out the Quantity of Dissolved Oxygen present in the given water sample

by Winkler’s Method.

7.  To determine Biochemical Oxygen Demand exerted by the given wastewater

sample.

8.  To find out Chemical Oxygen Demand of the waste water sample.

9.  To study various Sanitary Fittings.

Design as per syllabus of theory.